Home > Term: mean operating hours
mean operating hours
The arithmetic average number of operating hours per building is the weighted sum of the number of operating hours divided by the weighted sum of the number of buildings.
- Part of Speech: noun
- Industry/Domain: Energy
- Category: Coal; Natural gas; Petrol
- Company: EIA
0
Creator
- Pud6
- 100% positive feedback